Tsingshan Hybrid DCT Pilot Line Project

ScreenShot_2026-08-24_145545_725

ScreenShot_2026-08-24_145605_721

  • Covers an area of 2700 m², including sub-assembly area, final assembly area, test area.
  • Total of 5 robot units锛 14 robots;  CT ≤80s.
  • Automatically case flexible press station,  Automatically robot flexible glue apply station, automatically flexible tightening unit; Auto measurement & shim selection station.
  • High flexibility: the assembly line is realized by robot handling instead of traditional conveyor & pallet system.
  • Expansibility: the expansion space of the assembly line-20 reserved stations.